Step 5 |
Type the desired Report ID. For example, DAFR7400.
The D64 Report Control Profile is centrally maintained and determines available options for the Report Request and Report Distribution Profiles. The
Comptroller’s office establishes the D64 for each requestable report.
Skip Report Shot
A picture of the Report Control Profile screen
TEXAS SD64 UNIFORM STATEWIDE ACCOUNTING SYSTEM 10/01/95 02:30 PM
LINK TO: REPORT CONTROL PROFILE
ACTION: R (A=ADD, C=CHANGE, D=DELETE, N=NEXT, R=RECALL)
REPORT ID: DAFR7400 AGENCY BUDGET ACTIVITY DETAIL
REQUESTABLE IND: 2 (0=NOT, 1=CENTRALLY, 2=REQUESTABLE BY ALL) CONF: N
PRINT REMOTE IND: Y (Y=YES, N=NO) PRINTER TYPE: M (L=LOW, M=MEDIUM, H=HIGH)
INTERVAL OPTIONS (R=REQUIRED, O=OPTIONAL, N=NOT ALLOWED)-
TIME FRAME - AP YEAR: O PERIOD: R
FREQUENCY - MMDDYY: N DAILY: N WEEKLY: N MONTHLY: O QUARTERLY: N ANNUALLY: N
LEVEL OPTIONS (N=NOT ALLOWED OR LOW AND HIGH VALUE ALLOWED)-
LO - ORG: 2 PGM: 0 OBJ: N FUND: 3 NACUBO FUND: N GL ACCT: N GRANT: 0 PROJ: N
HI - ORG: 9 PGM: 9 OBJ: N FUND: 4 NACUBO FUND: N GL ACCT: N GRANT: 2 PROJ: N
SPECIAL SELECTS (R=REQUIRED, O=OPTIONAL, N=NOT ALLOWED)-
AGENCY: R ORG CODE: O AE: Y DF: N PJ: N
PROGRAM CODE: O NACUBO FUND: N AF: N GL: Y
APPROP FUND: O FUND: O AB: N GP: N
COMP OBJECT: N AGENCY OBJECT: O AP: N IV: N
GL ACCT: N AGENCY GL ACCT: N CC: N CF: N
GRANT: O PROJECT: N
SPECIAL SELECT 1: R EDIT: A2 SPECIAL SELECT 2: O EDIT: A1 STATUS CODE: A
EFF START DATE: 05011995 EFF END DATE: LAST PROC DATE:
F1-HELP F3-END F4-INTERRUPT F6-PROCESS
Highlighted Elements
Highlighted elements include:
Note: Use Report Help (F1) to view a description of the requestable report, including the sort order and the allowable values for
Special Selects 1 and 2. The values are:
R-Required; O-Optional; N-Not allowed.
|
Step 6 |
View the report optional elements, required elements, and unavailable elements shown below in the D64 Report Control Profile.
- Who can request this report?
- What fields are required, optional, or not allowed?
- What are the customizing features allowed?
Skip Report Shot
A picture of the Report Control Profile screen
TEXAS SD64 UNIFORM STATEWIDE ACCOUNTING SYSTEM 05/01/95 02:30 PM
LINK TO: REPORT CONTROL PROFILE
ACTION: R (A=ADD, C=CHANGE, D=DELETE, N=NEXT, R=RECALL)
REPORT ID: DAFR7400 AGENCY BUDGET ACTIVITY DETAIL
REQUESTABLE IND: 2 (0=NOT, 1=CENTRALLY, 2=REQUESTABLE BY ALL) CONF: N
PRINT REMOTE IND: Y (Y=YES, N=NO) PRINTER TYPE: M (L=LOW, M=MEDIUM, H=HIGH)
INTERVAL OPTIONS (R=REQUIRED, O=OPTIONAL, N=NOT ALLOWED)-
TIME FRAME - AP YEAR: R PERIOD: R
FREQUENCY - MMDDYY: N DAILY: N WEEKLY: N MONTHLY: O QUARTERLY: N ANNUALLY: N
LEVEL OPTIONS (N=NOT ALLOWED OR LOW AND HIGH VALUE ALLOWED)-
LO - ORG: 2 PGM: 0 OBJ: N FUND: 3 NACUBO FUND: N GL ACCT: N GRANT: N PROJ:N
HI - ORG: 5 PGM: 5 OBJ: N FUND: 4 NACUBO FUND: N GL ACCT: N GRANT: N PROJ:N
SPECIAL SELECTS (R=REQUIRED, O=OPTIONAL, N=NOT ALLOWED)-
AGENCY: R ORG CODE: O AE: Y DF: N PJ:N
PROGRAM CODE: O NACUBO FUND: N AF: N GL: Y
APPROP FUND: O FUND: O AB: N GP: N
COMP OBJECT: N AGENCY OBJECT: N AP: N IV: N
GL ACCT: N AGENCY GL ACCT: N CC: N CF: N
GRANT: N PROJECT: N
SPECIAL SELECT 1: R EDIT: A1 SPECIAL SELECT 2: O EDIT: A1 STATUS CODE: A
EFF START DATE: 05011995 EFF END DATE: LAST PROC DATE:
F1-HELP F3-END F4-INTERRUPT F6-PROCESS
- What is the frequency desired for this report? How often do you want it generated?
MMDDYY (specific date) reports will be generated on that particular date following the last daily batch IEU cycle that is run.
Daily reports will be generated each day following the last daily batch IEU cycle that is run.
Weekly reports will be generated the weekend following the last daily batch IEU cycle of each week.
Monthly reports will be generated on the weekend after the last daily batch IEU cycle has been run. Reports with transaction-related (detail level)
data must be generated over the weekend.
Quarterly reports will be generated on the weekend after the last daily batch IEU cycle runs. Reports with transaction-related (detail level) data
must be generated over the weekend.
Annual reports will be generated on the weekend after the last daily batch IEU cycle runs. Reports with transaction-related (detail level) data must be
generated over the weekend.
Recommendation: Print the D64 Profile for the desired report to eliminate the need to link back and forth from the D64 Profile to the 91 Report Request
Profile.
USAS REQUESTABLE REPORTS-ALL AGENCIES
Weekdays Weekends
Transaction Level Reports Daily Activity Only Open Periods
Inactive Periods*
Balance Level Reports FY96 No Change
PY (FY95)
* First weekend of the month
|